Automated Tidal Data Processing and Ellipsoid-to-LAT Separation

Automated Tidal Data Processing and Ellipsoid-to-LAT Separation

How QOffshore developed a repeatable tidal and GNSS processing workflow for a Perth-based engineering client.

CLIENT

Perth-based engineering client

QOFFSHORE ROLE

Processing methodology and automation

PROGRAMME

Approximately 18 tide-gauge nodes

OBSERVATIONS

Approximately 75 hours or more per node

SERVICE

Tidal and GNSS data processing

INSTRUMENTS

Tide gauges, barometers and GNSS buoys

WORKFLOW

More than 35 principal processing stages

OUTPUTS

Ellipsoid-to-LAT separation and QA/QC records

Project overview

A Perth-based engineering client engaged QOffshore to develop an automated processing methodology for a tidal and GNSS observation programme involving approximately 18 bottom-mounted tide-gauge nodes.

Each node combined pressure-based tidal observations with barometric data and GNSS observations acquired from a buoy positioned above the tide gauge for approximately 75 hours or more. The technical objective was to derive and validate the separation between Lowest Astronomical Tide (LAT) and the ellipsoidal reference surface at each node.

The challenge

The dataset incorporated multiple instruments, reference points and time series. Producing a reliable result required substantially more than matching the tide-gauge curve with GNSS heights. Every observation had to be checked, corrected and referenced through a consistent, defensible methodology.

The processing sequence contained more than 35 principal stages, with calibration, parameter and QA/QC requirements within individual stages. Repeating the complete sequence manually across approximately 18 nodes would have required significant specialist effort and created a risk of inconsistent handling between datasets.

What QOffshore provided

QOffshore converted the hydrographic and geodetic methodology into a tailored processing workflow designed around the client’s tide gauges, barometers, GNSS buoys and file structures.

Automated tidal data processing dashboard showing tide-gauge comparison, sensor drift assessment and QA plots.
Automated tidal data processing dashboard showing tide-gauge comparison, sensor drift assessment and QA plots.

The workflow addressed:

Technical validation

QOffshore retained specialist review gates throughout the automated process. Paired tide-gauge and GNSS observations were evaluated through time-series comparison, regression analysis and residual assessment. These checks supported identification of outliers, timing inconsistencies, unexpected instrument behaviour and observation periods unsuitable for the datum calculation.

Regression analysis used to assess the agreement between GNSS ellipsoidal heights and tide-gauge observations.
Regression analysis used to assess the agreement between GNSS ellipsoidal heights and tide-gauge observations.
Residual distribution used to assess the consistency of the paired observations and identify anomalous results.
Residual distribution used to assess the consistency of the paired observations and identify anomalous results.

Specialist review and technical judgement

The automated tools did not replace technical judgement. QOffshore’s domain knowledge was required to define the sequence of operations, select appropriate corrections, establish acceptance controls and interpret the results within the limitations of the sensors and observation period.

Outcome and client value

The client received a processing methodology tailored to its own GNSS and tidal instrumentation rather than a one-off set of calculations. The resulting workflow can be applied consistently across the current programme and reused for planned projects over the coming years.

For the initial project, the client estimated that the automated methodology avoided approximately AUD 150,000 in processing costs. Further value is expected through reuse of the tools, reduced repetitive handling and consistent QA/QC across subsequent deployments.

Key value delivered

35+

CONTROLLED PROCESSING STAGES

~18

TIDE-GAUGE NODES

75+ hours

OBSERVATIONS PER NODE

~AUD 150,000

CLIENT-ESTIMATED FIRST-PROJECT SAVINGS

Discuss your data processing project

QOffshore delivers marine survey data processing and automation solutions founded on hydrographic, geodetic and offshore project experience. Contact QOffshore Services to discuss a tailored workflow for tidal, GNSS, hydrographic, geophysical or GIS datasets.